Performance Confirmation Plan
Lindner, E.N.
United States. Department of Energy. Yucca Mountain Project Office.
关键词: Testing;    Monitoring;    Positioning;    Construction;    Accuracy;   
DOI  :  10.2172/762950
RP-ID  :  TDR-PCS-SE-000001 REV 01 ICN 01
RP-ID  :  AC08-91RW00134
RP-ID  :  762950
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.

【 预 览 】
附件列表
Files Size Format View
762950.pdf 264KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:33次