科技报告详细信息
Oak Ridge Y-12 Plant Emergency Action Level (EAL) Process | |
Bailiff, E.G. ; Bolling, J.D. | |
Oak Ridge Y-12 Plant | |
关键词: Emergency Plans; Program Management; Classification; Standards; Contractors; | |
DOI : 10.2172/761731 RP-ID : EMPO-559/Rev.2 RP-ID : AC05-84OR21400 RP-ID : 761731 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This report establishes requirements and standard methods for the development and maintenance of the Emergency Action Level (EAL) Process used by all lead and event contractors for emergency planning and preparedness. The EAL process ensures a technically defensible approach to emergency categorization/classification in accordance with DOE Order 151.1. The instructions provided in this document include methods and requirements for the development and approval of the EAL process. EALs are developed to cover events inside and outside the Y-12 Plant and to allow the Emergency Response Organization (ERO) to classify or reclassify events promptly based on specific indicators. This report is divided into the following 11 subsections: (1) EAL Process, (2) Categorization/Classification System for Operational Emergencies, (3) Development of EALs, (4) Barrier Analysis for EALs, (5) Symptom-Based and Event-Based EALs, (6) Other Considerations, (7) Integration of EALs with Normal and Off-Normal Operations, (8) EAL Manual, (9) Testing EALs for Completeness, (10) Training and Implementation of EALs, and (11) Configuration Management.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
761731.pdf | 161KB | download |