Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site | |
Barnett, DB | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Water Treatment Plants; Monitoring; Liquid Wastes; Tritium; Ground Water; | |
DOI : 10.2172/761191 RP-ID : PNNL-13121 RP-ID : AC06-76RL01830 RP-ID : 761191 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing tritium from treatment of Hanford Site liquid wastes at the 200 Area Effluent Treatment Facility (ETF). Since operation of the SALDS began in December 1995, discharges of tritium have totaled {approx}304 Ci, only half of what was originally predicted for tritium quantity through 1999. Total discharge volumes ({approx}2.7E+8 L) have been commensurate with predicted volumes to date. This document reports the results of all tritium analyses in groundwater as determined from the SALDS tritium-tracking network since the first SALDS wells were installed in 1992 through July 1999, and provides interpretation of these results as they relate to SALDS operation and its effect on groundwater. Hydrologic and geochemical information are synthesized to derive a conceptual model, which is in turn used to arrive at an appropriate approach to continued groundwater monitoring at the facility.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
761191.pdf | 6409KB | download |