科技报告详细信息
Reactivation of an Idle Lease to Increase Heavy Oil Recovery through Application of Conventional Steam Drive Technology in a Low Dip Slope and Basin Reservoir in the Midway-Sunset Field, San Jaoquin Basin, California, Class III
Schamel, Steven ; Deo, Milind ; Deets, Mike ; Olsen, Keven
National Petroleum Technology Program (U.S.)
关键词: Oil Wells;    Stratigraphy;    02 Petroleum;    Geologic Models;    Well Completion;   
DOI  :  10.2172/753924
RP-ID  :  DOE/BC/14937-11
RP-ID  :  FC22-95BC14937
RP-ID  :  753924
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
During the initial phase of the project a multifaceted feasibility study was carried out to examine whether the pilot project could be justified technically and economically at this site. This study included: (1) Recompletion of 9 shut-in wells and drilling of a additional producer and a new temperature observation well. A core was taken from the reservoir interval in the new producer, Pru-101. The wells were produced by conventional cyclic steaming over a period of 15 months to establish a production baseline for the site, (2) Characterization of the stratigraphy and petrophysical properties of the Monarch Sand reservoir using existing well logs and analyses on samples in the core taken from Pru-101. The resulting data were used to develop a geostatistical model of the reservoir at the Pru Fee property and a specific reservoir simulator for the pilot test site on the property, and (3) Use of the reservoir simulator to test various steamflood and cyclic steaming production options leading to design of a production strategy for the pilot steamflood based on a four pattern, 9-spot array covering 8 ac near the center of the 40 ac Pru Fee property. The array chosen required drilling additional producers and injectors to supplement the existing wells recompleted in the initial phase of the project.
【 预 览 】
附件列表
Files Size Format View
753924.pdf 2599KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:16次