Army Corps of Engineers: Known Performance Issues with New Orleans Drainage Canal Pumps Have Been Addressed, but Guidance on Future Contracts Is Needed | |
United States. Government Accountability Office. | |
United States. Government Accountability Office. | |
关键词: Government accountability -- United States.; economic development; government operations; homeland security; army corps of engineers; | |
RP-ID : GAO-08-288 RP-ID : 270855 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
A letter report issued by the Government Accountability Office with an abstract that begins "Hurricane Katrina caused several breaches in the floodwalls along three drainage canals in New Orleans, contributing to catastrophic flooding. To restore the pre-Katrina level of hurricane-related flood protection, the Army Corps of Engineers (Corps) decided to acquire several large-capacity pumping systems. During the process of acquiring, testing, and installing the pumping systems, issues with the pump contract and operation of the pumping systems came to light, including several identified in a Corps Independent Team Report (ITR). GAO was asked to evaluate the Corps' efforts to (1) develop contract specifications and award the contract, (2) address pumping system performance issues, (3) document contract modifications, and (4) reconcile contract payments. GAO reviewed contract and testing documents, observed the operation of the pumping system, and interviewed officials from the Corps, its consultants and contractors, and the ITR team."
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
270855.pdf | 3821KB | download |