科技报告详细信息
PowerLight Corporation Lean Manufacturing, PV Manufacturing R&D Phase I Report: 6 December 2001--31 March 2003
Hargis, L ; Botkin, J.
National Renewable Energy Laboratory (U.S.)
关键词: 14 Solar Energy;    Pv;    Capacity;    Process Control;    Solar Energy - Photovoltaics;   
DOI  :  10.2172/15016394
RP-ID  :  NREL/SR-520-35881
RP-ID  :  AC36-99-GO10337
RP-ID  :  15016394
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

PowerLight Corporation (PowerLight) has completed Phase I of its PV Manufacturing R&D subcontract, ''PowerGuard Lean Manufacturing,'' Subcontract No. NDO-1-30628-04. The overall technical goal of this project was to reduce the cost of PowerGuard manufacturing while simultaneously improving product quality. This will enable PowerLight to scale up production capacity as the market for PowerGuard continues to grow. Through the introduction of world-class lean manufacturing techniques, PowerLight was to cut out waste in the manufacturing process of PowerGuard. The manufacturing process was to be overhauled with an objective of removing as much as possible those steps that do not add value to the product. Quality of finished goods was also to be improved through the use of statistical process control and error-proofing in the manufacturing process. Factory operations were also to be addressed to streamline those factory activities that support the manufacturing process. This report de tails the progress made toward the above listed goals during the first phase of this subcontract.

【 预 览 】
附件列表
Files Size Format View
15016394.pdf 805KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:14次