Blanket Biological Review for General Maintenance Activities Within Active Burial Grounds, 200 E and 200 W Areas, ECR No. 2002-200-034 | |
Sackschewsky, Michael R. | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Removal; Plants; Management; Storage; State Government; | |
DOI : 10.2172/15010290 RP-ID : PNNL-14133 RP-ID : AC05-76RL01830 RP-ID : 15010290 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds. This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The Ecological Compliance Assessment Project (ECAP) staff should consulted prior to the initiation of major work activities within areas where this species has been identified (218-E-12, 218-E-10). The stalked-pod and crouching milkvetch are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for pl ant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). This blanket review does not apply to the portions of 218-W-4C, and 218-W-6 previously described.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
15010290.pdf | 212KB | download |