科技报告详细信息
Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1
Williams, Bruce A.
Pacific Northwest National Laboratory (U.S.)
关键词: Settling Ponds;    Installation;    Ground Water;    Water Wells;    11 Nuclear Fuel Cycle And Fuel Materials;   
DOI  :  10.2172/15006074
RP-ID  :  PNNL-14070-ICN-1
RP-ID  :  AC05-76RL01830
RP-ID  :  15006074
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan.

【 预 览 】
附件列表
Files Size Format View
15006074.pdf 204KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:9次