科技报告详细信息
Plutonium Immobilization Task 5.6 Metal Conversion: Milestone Report - Perform Feasibility Demonstrations on Pu-Al Alloys
Zundelevich, Y ; Kerns, J ; Bannochie, C
Lawrence Livermore National Laboratory
关键词: Plutonium Hydrides;    Alloys;    Hydrides;    36 Materials Science;    Stainless Steels;   
DOI  :  10.2172/15003404
RP-ID  :  UCRL-ID-143346
RP-ID  :  W-7405-ENG-48
RP-ID  :  15003404
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Plutonium Conversion Task within the Plutonium Immobilization Program (PIP) transforms incoming plutonium (Pu) feed materials into an oxide acceptable for blending with ceramic precursors. One of the feed materials originally planned for PIP was unirradiated fuel, which consisted mainly of the Zero Power Plutonium Reactor (ZPPR) fuel. Approximately 3.5 metric tons of Pu is in ZPPR fuel. The ZPPR fuel is currently stored at the Argonne National Laboratory-West as stainless steel clad metal plates and oxide pellets, with the vast majority of the Pu in the metal plates. The metal plates consist of a Pu-U-Mo alloy (containing 90% of the ZPPR plutonium metal) and a Pu-Al alloy (containing 10% of the ZPPR plutonium metal). The Department of Energy (DOE) decided that ZPPR fuel is a national asset and, therefore, not subject to disposition. This report documents work done prior to that decision. The Hydnde-Oxidation (HYDOX) Process was selected as the method for Metal Conversion in PIP because it provides a universal means for preparing oxide from all feed materials. HYDOX incorporates both the hydride process, originally developed to separate Pu from other pit materials, as well as the oxide formation step. Plutonium hydride is very reactive and is readily converted to either the nitride or the oxide. A previous feasibility study demonstrated that the Pu-U-Mo alloy could be successfully converted to oxide via the HYDOX Process. Another Metal Conversion milestone was to demonstrate the feasibility of the HYDOX Process for converting plutonium-aluminum (Pu-Al) alloy in ZPPR fuel plates to an acceptable oxide. This report documents the results of the latter feasibility study which was performed before the DOE decision to retain ZPPR fuel rather than immobilize it.

【 预 览 】
附件列表
Files Size Format View
15003404.pdf 313KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:7次