科技报告详细信息
Final Technical Report
Velasco, Mayda
Northwestern University (Evanston, Ill.)
关键词: Instrumentation;    Accelerator Technology;    72 Physics Of Elementary Particles And Fields Instrumentation;    Beam Protection;   
DOI  :  10.2172/1098050
RP-ID  :  DOE-NORTHWESTERN-41397
RP-ID  :  FG02-05ER41397
RP-ID  :  1098050
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

【 预 览 】
附件列表
Files Size Format View
1098050.pdf 840KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:6次