Land-Use Requirements for Solar Power Plants in the United States | |
Ong, S. ; Campbell, C. ; Denholm, P. ; Margolis, R. ; Heath, G. | |
National Renewable Energy Laboratory (U.S.) | |
关键词: 14 Solar Energy; Energy Analysis; Utility-Scale Solar Facilities; 24 Power Transmission And Distribution; 32 Energy Conservation, Consumption, And Utilization Utility-Scale Solar Facilities; | |
DOI : 10.2172/1086349 RP-ID : NREL/TP-6A20-56290 RP-ID : AC36-08GO28308 RP-ID : 1086349 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1086349.pdf | 1570KB | download |