科技报告详细信息
Geothermal FIT Design: International Experience and U.S. Considerations
Rickerson, W. ; Gifford, J. ; Grace, R. ; Cory, K.
National Renewable Energy Laboratory (U.S.)
关键词: Risk;    Geothermal Energy;    Finance;    Drilling;    15 Geothermal Energy;   
DOI  :  10.2172/1050768
RP-ID  :  NREL/TP-6A20-53320
RP-ID  :  AC36-08GO28308
RP-ID  :  1050768
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmission capacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermal power plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

【 预 览 】
附件列表
Files Size Format View
1050768.pdf 1931KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:19次