Cooperation Reliability Testing of the Clipper Windpower Liberty 2.5 MW Turbine: Cooperative Research and Development Final Report, CRADA Number CRD-07-210 | |
Hughes, S. | |
National Renewable Energy Laboratory (U.S.) | |
关键词: Testing; Wind Power Crada; Commercialization And Technology Transfer; Crada; Reliability; | |
DOI : 10.2172/1040936 RP-ID : NREL/TP-5000-53574 RP-ID : AC36-08GO28308 RP-ID : 1040936 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Clipper Windpower (CWP) has developed the Liberty 2.5 MW wind turbine. The development, manufacturing, and certification process depends heavily on being able to validate the full-scale system design and performance under load in both an accredited structural test facility and through accredited field testing. CWP requested that DOE/ NREL upgrade blade test capabilities to perform a scope of work including structural testing of the C-96 blade used on the CWP Liberty turbine. This funds-in CRADA was developed to upgrade NREL blade test capability, while enabling certification testing of the C-96 blade through the facility and equipment upgrades. NREL shared resource funds were used to develop hardware necessary to structurally attach a large wind turbine to the test stand at the NWTC. Participant funds-in monies were used for developing the test program.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1040936.pdf | 187KB | download |