EC Transmission Line Risk Identification and Analysis
Bigelow, Tim S
Oak Ridge National Laboratory
关键词: Testing;    Implementation;    Functionals;    24 Power Transmission And Distribution;    Power Transmission Lines;   
DOI  :  10.2172/1038483
RP-ID  :  ORNL/TM-2012/111
RP-ID  :  DE-AC05-00OR22725
RP-ID  :  1038483
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

【 预 览 】
附件列表
Files Size Format View
1038483.pdf 451KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:13次