科技报告详细信息
INTEGRATED DM 1200 MELTER TESTING OF HLW C-106/AY-102 COMPOSITION USING BUBBLERS VSL-03R3800-1 REV 0 9/15/03
AA, KRUGER ; KS, MATLACK ; W, GONG ; T, BARDAKCI ; NA, D' ; ANGELO ; WK, KOT ; IL, PEGG
Hanford Site (Wash.)
关键词: Testing;    Processing;    Glass;    Off-Gas Systems;    Production;   
DOI  :  10.2172/1034652
RP-ID  :  ORP-51439 Rev 0
RP-ID  :  DE-AC27-08RV14800
RP-ID  :  1034652
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report documents melter and off-gas performance results obtained on the DM1200 HLW Pilot Melter during processing of simulated HLW C-106/AY-102 feed. The principal objectives of the DM1200 melter testing were to determine the achievable glass production rates for simulated HLW C-106/AY-102 feed; determine the effect of bubbling rate on production rate; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and to perform pre- and post test inspections of system components.

【 预 览 】
附件列表
Files Size Format View
1034652.pdf 7149KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:17次