TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY
Stefanko, D. ; Langton, C.
Savannah River Site (S.C.)
关键词: Removal;    Solubility;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;    Wastes;    Closures;   
DOI  :  10.2172/1034093
RP-ID  :  SRNL-STI-2011-00749
RP-ID  :  DE-AC09-08SR22470
RP-ID  :  1034093
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale up test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.

【 预 览 】
附件列表
Files Size Format View
1034093.pdf 1053KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:9次