ANALYSIS OF HARRELL MONOSODIUM TITANATE LOT #081811 | |
Taylor-Pashow, K. ; Fink, S. | |
Savannah River Site (S.C.) | |
关键词: Removal; Filtration; Actinides; Specifications; Sampling; | |
DOI : 10.2172/1029112 RP-ID : SRNL-STI-2011-00619 RP-ID : DE-AC09-08SR22470 RP-ID : 1029112 |
|
美国|英语 | |
来源: UNT Digital Library | |
![]() |
【 摘 要 】
Monosodium titanate (MST) for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot No.081811 qualification and 12 verification samples met all the requirements in the specification, with the possible exception of the geometric standard deviation for particle size. Two subsamples from the qualification sample were analyzed, giving results of 3.82 and 3.28, respectively, for the geometric standard deviation. The specification is {le}3.5. The results for both samples met the remaining particle size specifications, i.e. <10 vol% below 0.8 {mu}m and <1 vol% above 37 {mu}m. Filtration behavior of the current batch is expected to be near that of recent batches. SRNL recommends acceptance of this material. SRNL also recommends performing a statistical review of particle size data for the MST lots from this vendor to assess whether an improved material specification is appropriate.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1029112.pdf | 95KB | ![]() |