INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK | |
Abitz, R. ; Jackson, D. ; Eddy-Dilek, C. | |
Savannah River Site (S.C.) | |
关键词: Buildings; Violations; Basements; Water Removal; Compliance; | |
DOI : 10.2172/1021455 RP-ID : SRNL-STI-2011-00334 RP-ID : DE-AC09-08SR22470 RP-ID : 1021455 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1021455.pdf | 2939KB | download |