科技报告详细信息
CONFIRMATORY SURVEY RESULTS FOR PORTIONS OF THE MATERIALS AND EQUIPMENT FROM UNITS 1 AND 2 AT THE HUMBOLDT BAY POWER PLANT, EUREKA, CALIFORNIA | |
Adams, W. C. | |
Oak Ridge Institute for Science and Education | |
关键词: Criticality; Power Plants; Heat Transfer; Natural Convection; Nuclear Energy; | |
DOI : 10.2172/1017048 RP-ID : 11-IEAV-0885 RP-ID : DE-AC05-06OR23100 RP-ID : 1017048 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under Atomic Energy Commission (AEC) provisional license number DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures. Also, the pressure suppression containment design permitted below-ground construction. Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination—zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination. A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details).【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1017048.pdf | 2906KB | download |