| Summary of NGNP Engineering Analysis Progress in Fiscal Year 2010 | |
| Mills, Phillip M. | |
| Idaho National Laboratory | |
| 关键词: Next Generation Nuclear Power Plant Project; Ngnp; Coolants; 42 Engineering; Fission Products; | |
| DOI : 10.2172/1000540 RP-ID : INL/EXT-10-19772 RP-ID : DE-AC07-05ID14517 RP-ID : 1000540 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
The Engineering Analysis work package accomplished a number of activities in FY2010 that will help to inform Licensing, R&D, and detailed design activities that will be performed during the preliminary design phase in Phase 2 of the NGNP Project. These activities were in the following areas: • Fission Product Transport • DDN Update and Consolidation • Gas Reactor Lessons Learned Review • Reactor Coolant Chemistry Control • Resilient Control Systems for High Temperature Gas-cooled Reactors • Water-ingress Analysis In total, the efforts associated with the Engineering Analysis work package accomplished four (4) Level 2 milestones and two (2) internal (Level 4) milestones. Details of the activities and milestones are included in the attached report.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 1000540.pdf | 675KB |
PDF