科技报告详细信息
Explanation of Change Cost and Schedule Growth Study Interim Status Briefing
Emmons, Debra ; Croonce, Thomas ; Bitten, Bob
PID  :  NTRS Document ID: 20100017082
RP-ID  :  HQ-STI-10-043
学科分类:社会科学、人文和艺术(综合)
美国|英语
来源: NASA Technical Reports Server
PDF
【 摘 要 】
This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects.A second goal was to determine the percentage of growth that was outside the control of the project.The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time.This briefing reviews the results of the study of the first 20 missions.
【 预 览 】
附件列表
Files Size Format View
RO201712050003359LZ 537KB PDF download
  文献评价指标  
  下载次数:26次 浏览次数:28次