科技报告详细信息
Facility Safety Plan B360 Complex CMLS-411r0
Cooper, G
关键词: CHEMISTRY;    CONSULTANTS;    LAWRENCE LIVERMORE NATIONAL LABORATORY;    MANAGEMENT;    OCCUPANTS;    REGULATIONS;    SAFETY;   
DOI  :  10.2172/899426
RP-ID  :  UCRL-TR-227217
PID  :  OSTI ID: 899426
Others  :  TRN: US200708%%427
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Lawrence Livermore National Laboratory's (LLNL) Environmental, Safety and Health (ES&H) policy is that all operations must be planned and performed safely for the protection of workers, the public, the environment, and limit possible loss to property, facilities and equipment assigned to this directorate. In addition to observing LLNL policies contained in the ''Environment, Safety, and Health (ES&H) Manual'', LLNL workers will comply with applicable federal, state, and local regulations when conducting any activity that the Chemistry, Materials and Life Sciences (CMLS) Directorate has managerial control or oversight. Management has determined that the safety controls specified within this Facility Safety Plan (FSP) must also be followed to ensure that the operation is successfully performed efficiently and safely within this facility. Any operations conducted in this Complex that involve activities not commonly performed by the public require an Integration Work Sheet (IWS) or IWS/Safety Plan (IWS/SP) that specifically assesses the responsibilities, hazards and controls to conduct the operation safely. Everyone who enters this area (including students, workers, visitors, and consultants) must follow the applicable requirements in this FSP. Each person is expected to protect himself/herself and others from injury or illness. Regular facility occupants are expected to guide and govern visitors and assist new or temporary occupants in understanding and following this plan. When there are any doubts regarding the safety of any phase of work, workers and others will check with the facility manager. Changes to this FSP will be approved by the Facility Associate Director (AD). This will undergo triennial review to establish, at a minimum, that its contents are appropriate and adequate for current operations. The Hazards Control ES&H Team assists management in instituting and maintaining a minimum-risk and environmentally sound work environment. Any Laboratory worker has the authority to order any activity stopped immediately if, in his/her judgment, the procedure or circumstances represent an imminent threat to human safety, health, the environment, or buildings and equipment.

【 预 览 】
附件列表
Files Size Format View
RO201705190002986LZ 1800KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:3次