科技报告详细信息
2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
D. E. Shanklin
关键词: AR FACILITIES;    INEEL;    MONITORING;    PERFORMANCE;    STORAGE FACILITIES;    INSPECTION;    REMEDIAL ACTION;    RADIOACTIVE WASTE MANAGEMENT Waste Area Group 3;   
DOI  :  10.2172/912633
RP-ID  :  DOE/ID-11310
PID  :  OSTI ID: 912633
Others  :  TRN: US0800432
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).

【 预 览 】
附件列表
Files Size Format View
RO201705190002730LZ 4852KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:16次