Final Technical Report | |
Joseph Junker ; Greg Wheeler | |
关键词: COMPUTERS; EDUCATION; ENERGY EFFICIENCY; EVALUATION; IMPLEMENTATION; MANUFACTURERS; PRODUCTIVITY; INDUSTRY Energy; Waste; Productivity; Industry; Assessments; | |
DOI : 10.2172/899879 RP-ID : DOE02GO12084FinalTech PID : OSTI ID: 899879 Others : TRN: US200722%%88 |
|
学科分类:能源(综合) | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
Since 1986 the Oregon State University Industrial Assessment Center (OSU IAC) has worked to increase the energy efficiency, productivity, sustainability, and competitiveness of US manufacturers; provide engineering students an education not available in the classroom; keep engineering faculty in contact with technology and challenges in Northwest industry; and reduce dependence on nonrenewable energy resources, both imported and domestic. Project Objective: Over the duration of this project (2002-2006), the OSU IAC worked to directly support and influence industrial decisions primarily regarding energy but also regarding sustainability and profitability through: Assessments & Follow-up: The OSU IAC performed 111 Industrial Assessments in Oregon, Washington, Idaho and Nevada to help industry identify and implement opportunities to increase energy efficiency, productivity, sustainability, and competitiveness Workshops Seminars Forums Etc: OSU IAC staff worked with regional peers to offer appropriate workshops and trainings as opportunities availed themselves. Graduating Excellent Energy Aware Professional Alumni: As technically capable, skilled written and verbal communicators, our alumni contributed to OSU IAC influence from their positions within industry, consulting organizations, utilities, and governmental and non governmental agencies. Tool Development: Analysis tools and guides originated at the OSU IAC extended our reach. The center continually worked to develop computer based analysis tools, evaluation checklists, analysis guide sheets for internal use and general sharing with industry, energy, and other professionals to assist them in efforts to improve US Industry. Impact: Over 20 years of activity the OSU IAC has typically performed 25 Industrial Assessments a year. On average, each year of 25 assessments has resulted in implemented projects that saved industry a total of: 25.3 TBTU in annual energy and $4.5 Million annually, with an average investment payback of one year. Over the duration of this project, while a number of recommendations are still under consideration for implementation, those already implemented have resulted in over $11 million in annual savings.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190002648LZ | 35KB | download |