Ultrasonic Examination of Double-Shell Tank 241-AN-107. Examination Completed March 2007 | |
Pardini, Allan F. ; Weier, Dennis R. | |
关键词: AR FACILITIES; AIR; AREVA NC; EVALUATION; PERSONNEL; TANKS; ULTRASONIC WAVES DST; UT; 241-AN-107; PNNL; Ultrasonic; Extreme Value; Weibull; | |
DOI : 10.2172/1034239 RP-ID : PNNL-16570 Rev. 0 PID : OSTI ID: 1034239 Others : Other: 830403000 Others : TRN: US1200784 |
|
学科分类:核能源与工程 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
AREVA NC Inc. (AREVA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-107. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AN-107 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-Plan-27202 (Jensen 2005) and summarized on page 1 of this document, are to be reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on electronic media and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations. The results of the examination of Tank 241-AN-107 have been evaluated by PNNL personnel. The ultrasonic examination consisted of two vertical 15-in.-wide scan paths over the entire height of the tank, the heat-affected zone (HAZ) of four vertical welds and one horizontal weld, the upper portion of the knuckle region, four small areas of the lower portion of the knuckle region within the air slot entrances, and the lower portion of the knuckle utilizing a multiple V path technique qualified for the extended Y-arm scanner from Riser 26. The examination also included two vertical 15-in.-wide scan paths over the entire height of the tank from Riser 25. The examination was performed to detect any wall thinning, pitting, or cracking in the primary tank wall.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190002257LZ | 1452KB | download |