Engineering Evaluation/Cost Analysis for Power Burst Facility (PER-620) Final End State and PBF Vessel Disposal | |
B. C. Culp | |
关键词: AR FACILITIES; ENGINEERING; ECONOMIC ANALYSIS; DECOMMISSIONING; SURPLUS NUCLEAR FACILITIES; PRESSURE VESSELS; RADIOACTIVE WASTE DISPOSAL Engineering evaluation and cost analysis; | |
DOI : 10.2172/912631 RP-ID : DOE/ID-11309 PID : OSTI ID: 912631 Others : TRN: US0800431 |
|
学科分类:核能源与工程 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
Preparation of this engineering evaluation/cost analysis is consistent with the joint U.S. Department of Energy and U.S. Environmental Protection Agency Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation, and Liability Act, (DOE and EPA 1995) which establishes the Comprehensive Environmental, Response, Compensation, and Liability Act non-time critical removal action process as an approach for decommissioning. The scope of this engineering evaluation/cost analysis is to evaluate alternatives and recommend a preferred alternative for the final end state of the PBF and the final disposal location for the PBF vessel.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190001992LZ | 1424KB | download |