科技报告详细信息
Old Harbor Scammon Bay Hydro Feasibility
Brent Petrie
关键词: COOPERATIVES;    DISTRIBUTION;    ELECTRIC UTILITIES;    PENSTOCKS;    WATER Alaska village Electric Cooperative;    Alaska;    Old Harbor;    Hydroelectric;   
DOI  :  10.2172/909380
RP-ID  :  None
PID  :  OSTI ID: 909380
Others  :  TRN: US200722%%1242
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The grantee, Alaska Village Electric Cooperative (AVEC), is a non-profit member owned rural electric generation and distribution cooperative. The proposed Project is located near the community of Old Harbor, Alaska. Old Harbor is on the southeastern coast of Kodiak Island, approximately 70 miles southwest of the City of Kodiak and 320 miles southwest of Anchorage. In 1998 sufficient information had been developed to apply for a license to construct the project and the cost was estimated to be $2,445,000 for a 500 KW project on Lagoon Creek. Major features of the project included an eight-foot high diversion dam on Mountain Creek, a desander box, a 9,800-foot long penstock to the powerhouse on Lagoon Creek, and a 5,500-foot long access road. It was also anticipated that the project could provide an additional source of water to Old Harbor. The report details the history and lessons learned in designing and permiting the proposed hydroelectric facility.

【 预 览 】
附件列表
Files Size Format View
RO201705190001605LZ 28956KB PDF download
  文献评价指标  
  下载次数:101次 浏览次数:40次