Advanced, Low/Zero Emission Boiler Design and Operation | |
Babcock /Wilcox ; Illinois State Geological ; Worley Parsons ; Parsons Infrastructure /Technology Group | |
关键词: BOILERS; COAL; COMBUSTION; DESIGN; ECONOMICS; FEASIBILITY STUDIES; FLUE GAS; RECYCLING; OXYGEN ENRICHMENT; PERFORMANCE; RETROFITTING; CARBON DIOXIDE; AIR POLLUTION CONTROL; | |
DOI : 10.2172/981651 RP-ID : None PID : OSTI ID: 981651 Others : TRN: US201012%%889 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
In partnership with the U.S. Department of Energy's National Energy Technology Laboratory, B&W and Air Liquide are developing and optimizing the oxy-combustion process for retrofitting existing boilers as well as new plants. The main objectives of the project is to: (1) demonstrate the feasibility of the oxy-combustion technology with flue gas recycle in a 5-million Btu/hr coal-fired pilot boiler, (2) measure its performances in terms of emissions and boiler efficiency while selecting the right oxygen injection and flue gas recycle strategies, and (3) perform technical and economic feasibility studies for application of the technology in demonstration and commercial scale boilers. This document summarizes the work performed during the period of performance of the project (Oct 2002 to June 2007). Detailed technical results are reported in corresponding topical reports that are attached as an appendix to this report. Task 1 (Site Preparation) has been completed in 2003. The experimental pilot-scale O{sub 2}/CO{sub 2} combustion tests of Task 2 (experimental test performance) has been completed in Q2 2004. Process simulation and cost assessment of Task 3 (Techno-Economic Study) has been completed in Q1 2005. The topical report on Task 3 has been finalized and submitted to DOE in Q3 2005. The calculations of Task 4 (Retrofit Recommendation and Preliminary Design of a New Generation Boiler) has been completed in 2004. In Task 6 (engineering study on retrofit applications), the engineering study on 25MW{sub e} unit has been completed in Q2, 2008 along with the corresponding cost assessment. In Task 7 (evaluation of new oxy-fuel power plants concepts), based on the design basis document prepared in 2005, the design and cost estimate of the Air Separation Units, the boiler islands and the CO{sub 2} compression and trains have been completed, for both super and ultra-supercritical case study. Final report of Task-7 is published by DOE in Oct 2007.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190001585LZ | 11944KB | download |