科技报告详细信息
CH Packaging Operations Manual | |
Washington TRU Solutions LLC | |
关键词: payload; CH; contact-handled; pallet; certificate of compliance; TRUPACT-II; HalfPACT; TRAMPAC; locking ring; dunnage drums; four-pack; guide tubes; payload assembly; eight-pa; | |
DOI : 10.2172/926659 RP-ID : DOE/WIPP-02-3184, Rev. 6 PID : OSTI ID: 926659 |
|
学科分类:核能源与工程 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
This procedure provides instructions forassembling the following CH packaging payload: Drum payload assembly Standard Waste Box (SWB) assembly Ten-Drum Overpack (TDOP)
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190001159LZ | 887KB | download |