Phased Construction Completion Report for Building K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park Oak Ridge, Tennessee | |
Garland S. | |
关键词: BASEMENTS; CONSTRUCTION; CONTAMINATION; DEMOLITION; LAND USE; MAINTENANCE; POLYCHLORINATED BIPHENYLS; REMOVAL; TENNESSEE PCCR; K-1401; Remaining Facilities; | |
DOI : 10.2172/1015993 RP-ID : DOE/OR/01-2365&D1 PID : OSTI ID: 1015993 Others : TRN: US201113%%339 |
|
学科分类:环境科学(综合) | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705180002496LZ | 1518KB | download |