科技报告详细信息
Facility Configuration Study of the High Temperature Gas-Cooled Reactor Component Test Facility
S. L. Austad ; L. E. Guillen ; D. S. Ferguson ; B. L. Blakely ; D. M. Pace ; D. Lopez ; J. D. Zolynski ; B. L. Cowley ; V. J. Balls ; E.A. Harvego, P.E. ; C.W. McKnight, P.E. ; R.S. Stewart ; B.D. Christensen
关键词: CONFIGURATION;    DESIGN;    GAS COOLED REACTORS;    HEAT TRANSFER;    HELIUM;    HYDROGEN PRODUCTION;    PLANNING;    RAILWAYS;    SCHEDULES;    TRANSPORT Component Test Facility;    CTF;    HGTR;    test loops;   
DOI  :  10.2172/938444
RP-ID  :  INL/EXT-08-14132
PID  :  OSTI ID: 938444
Others  :  TRN: US0806099
学科分类:工程和技术(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
A test facility, referred to as the High Temperature Gas-Cooled Reactor Component Test Facility or CTF, will be sited at Idaho National Laboratory for the purposes of supporting development of high temperature gas thermal-hydraulic technologies (helium, helium-Nitrogen, CO2, etc.) as applied in heat transport and heat transfer applications in High Temperature Gas-Cooled Reactors. Such applications include, but are not limited to: primary coolant; secondary coolant; intermediate, secondary, and tertiary heat transfer; and demonstration of processes requiring high temperatures such as hydrogen production. The facility will initially support completion of the Next Generation Nuclear Plant. It will secondarily be open for use by the full range of suppliers, end-users, facilitators, government laboratories, and others in the domestic and international community supporting the development and application of High Temperature Gas-Cooled Reactor technology. This pre-conceptual facility configuration study, which forms the basis for a cost estimate to support CTF scoping and planning, accomplishes the following objectives: • Identifies pre-conceptual design requirements • Develops test loop equipment schematics and layout • Identifies space allocations for each of the facility functions, as required • Develops a pre-conceptual site layout including transportation, parking and support structures, and railway systems • Identifies pre-conceptual utility and support system needs • Establishes pre-conceptual electrical one-line drawings and schedule for development of power needs.
【 预 览 】
附件列表
Files Size Format View
RO201705180002217LZ 8845KB PDF download
  文献评价指标  
  下载次数:24次 浏览次数:26次