Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline, Waste Site Reclassification Form 2007-034 | |
J. M. Capron | |
关键词: COLUMBIA RIVER; EVALUATION; PIPELINES; REINFORCED CONCRETE; SAMPLING; SOILS; VERIFICATION; WASTES; WATER Hanford; 100F Area; 100-F-26:4 South Process Pipelines; 100-F-26:1 North Process Sewer Pipelines; 100-F-26:12 1.8-m Main Process Sewer Pipeline; 100-F-19 reactor cooling water effluent pipeline; Columbia River; | |
DOI : 10.2172/944195 RP-ID : RSVP-2007-034 PID : OSTI ID: 944195 Others : TRN: US0900671 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705180002085LZ | 35655KB | download |