科技报告详细信息
Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline, Waste Site Reclassification Form 2007-034
J. M. Capron
关键词: COLUMBIA RIVER;    EVALUATION;    PIPELINES;    REINFORCED CONCRETE;    SAMPLING;    SOILS;    VERIFICATION;    WASTES;    WATER Hanford;    100F Area;    100-F-26:4 South Process Pipelines;    100-F-26:1 North Process Sewer Pipelines;    100-F-26:12 1.8-m Main Process Sewer Pipeline;    100-F-19 reactor cooling water effluent pipeline;    Columbia River;   
DOI  :  10.2172/944195
RP-ID  :  RSVP-2007-034
PID  :  OSTI ID: 944195
Others  :  TRN: US0900671
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.
【 预 览 】
附件列表
Files Size Format View
RO201705180002085LZ 35655KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:22次