科技报告详细信息
EBR-II Primary Tank Wash-Water Alternatives Evaluation
Demmer, R. L. ; Heintzelman, J. B. ; Merservey, R. H. ; Squires, L. N.
关键词: CARBON DIOXIDE;    CLOSURES;    COOLANTS;    ENVIRONMENTAL QUALITY;    EVALUATION;    MANAGEMENT;    PASSIVATION;    REMOVAL;    SODIUM;    TANKS;    WASTE WATER;    WASTES;    WATER;    WATER VAPOR decommissioning;    sodium treatment;   
DOI  :  10.2172/933179
RP-ID  :  INL/EXT-08-14173
PID  :  OSTI ID: 933179
Others  :  TRN: US200814%%324
学科分类:工程和技术(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The EBR-II reactor at Idaho National Laboratory was a liquid sodium metal cooled reactor that operated for 30 years. It was shut down in 1994; the fuel was removed by 1996; and the bulk of sodium metal coolant was removed from the reactor by 2001. Approximately 1100 kg of residual sodium remained in the primary system after draining the bulk sodium. To stabilize the remaining sodium, both the primary and secondary systems were treated with a purge of moist carbon dioxide. Most of the residual sodium reacted with the carbon dioxide and water vapor to form a passivation layer of primarily sodium bicarbonate. The passivation treatment was stopped in 2005 and the primary system is maintained under a blanket of dry carbon dioxide. Approximately 670 kg of sodium metal remains in the primary system in locations that were inaccessible to passivation treatment or in pools of sodium that were too deep for complete penetration of the passivation treatment. The EBR-II reactor was permitted by the Idaho Department of Environmental Quality (DEQ) in 2002 under a RCRA permit that requires removal of all remaining sodium in the primary and secondary systems by 2022. The proposed baseline closure method would remove the large components from the primary tank, fill the primary system with water, react the remaining sodium with the water and dissolve the reaction products in the wash water. This method would generate a minimum of 100,000 gallons of caustic, liquid, low level radioactive, hazardous waste water that must be disposed of in a permitted facility. On February 19-20, 2008, a workshop was held in Idaho Falls, Idaho, to look at alternatives that could meet the RCRA permit clean closure requirements and minimize the quantity of hazardous waste generated by the cleanup process. The workshop convened a panel of national and international sodium cleanup specialists, subject matter experts from the INL, and the EBR-II Wash Water Project team that organized the workshop. The workshop was conducted by a trained facilitator using Value Engineering techniques to elicit the most technically sound solutions from the workshop participants. The path forward includes developing the OBA into a well engineered solution for achieving RCRA clean closure of the EBR-II Primary Reactor Tank system. Several high level tasks are also part of the path forward such as reassigning responsibility of the cleanup project to a dedicated project team that is funded by the DOE Office of Environmental Management, and making it a priority so that adequate funding is available to complete the project. Based on the experience of the sodium cleanup specialists, negotiations with the DEQ will be necessary to determine a risk-based de minimus quantity for acceptable amount of sodium that can be left in the reactor systems after cleanup has been completed.

【 预 览 】
附件列表
Files Size Format View
RO201705180002012LZ 446KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:18次