| Drilling, Sampling, and Well-Installation Plan for the IFC Well Field, 300 Area | |
| Bjornstad, Bruce N. ; Horner, Jacob A. | |
| 关键词: DRILLING; FABRICATION; GEOPHYSICAL SURVEYS; MASS TRANSFER; NUCLEAR FUELS; PLUMES; PONDS; SAMPLING; URANIUM; WASTES vadoze zone; 300 Area; Integrated Field-Scale Subsurface Research Challenge; IFC; uranium; | |
| DOI : 10.2172/934405 RP-ID : PNNL-17512 PID : OSTI ID: 934405 Others : Other: KP1504010 Others : TRN: US0803794 |
|
| 学科分类:核能源与工程 | |
| 美国|英语 | |
| 来源: SciTech Connect | |
PDF
|
|
【 摘 要 】
The 300 Area was selected as a location for an IFC because it offers excellent opportunities for field research on the influence of mass-transfer processes on uranium in the vadose zone and groundwater. The 300 Area was the location of nuclear fuel fabrication facilities and has more than 100 waste sites. Two of these waste sites, the North and South Process Ponds received large volumes of process waste from 1943 to 1975 and are thought to represent a significant source of the groundwater uranium plume in the 300 Area. Geophysical surveys and other characterization efforts have led to selection of the South Process Pond for the IFC.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| RO201705180001977LZ | 5157KB |
PDF