科技报告详细信息
242-16H 2H EVAPORATOR POT SAMPLING FINAL REPORT
Krementz, D ; William Cheng, W
关键词: AR FACILITIES;    DESCALING;    SCALE CONTROL;    EVAPORATORS;    SAMPLERS;    DESIGN;    PERFORMANCE;    SAMPLING;   
DOI  :  10.2172/934528
RP-ID  :  WSRC-STI-2008-00192
PID  :  OSTI ID: 934528
Others  :  TRN: US0803813
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Due to the materials that are processed through 2H Evaporator, scale is constantly being deposited on the surfaces of the evaporator pot. In order to meet the requirements of the Nuclear Criticality Safety Analysis/Evaluation (NCSA/NCSE) for 2H Evaporator, inspections of the pot are performed to determine the extent of scaling. Once the volume of scale reaches a certain threshold, the pot must be chemically cleaned to remove the scale. Prior to cleaning the pot, samples of the scale are obtained to determine the concentration of uranium and plutonium and also to provide information to assist with pot cleaning. Savannah River National Laboratory (SRNL) was requested by Liquid Waste Organization (LWO) Engineering to obtain these samples from two locations within the evaporator. Past experience has proven the difficulty of successfully obtaining solids samples from the 2H Evaporator pot. To mitigate this risk, a total of four samplers were designed and fabricated to ensure that two samples could be obtained. Samples had previously been obtained from the cone surface directly below the vertical access riser using a custom scraping tool. This tool was fabricated and deployed successfully. A second scraper was designed to obtain sample from the nearby vertical thermowell and a third scraper was designed to obtain sample from the vertical pot wall. The newly developed scrapers both employed a pneumatically actuated elbow. The scrapers were designed to be easily attached/removed from the elbow assembly. These tools were fabricated and deployed successfully. A fourth tool was designed to obtain sample from the opposite side of the pot under the tube bundle. This tool was fabricated and tested, but the additional modifications required to make the tool field-ready could not be complete in time to meet the aggressive deployment schedule. Two samples were obtained near the pot entry location, one from the pot wall and the other from the evaporator feed pipe. Since a third sampler was available and all of the radiological controls were in place, the decision was made to obtain a third sample. The third sampler dropped directly below the riser to obtain a scrape sample from the evaporator cone. Samples were obtained from all of these locations in sufficient quantities to perform the required analysis.

【 预 览 】
附件列表
Files Size Format View
RO201705180001772LZ 962KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:16次