科技报告详细信息
105-H Reactor Interim Safe Storage Project Final Report | |
E.G. Ison | |
关键词: CONSTRUCTION; DECOMMISSIONING; DECONTAMINATION; DEMOLITION; MONITORING; REACTOR CORES; REMOVAL; STORAGE; VENTILATION D&D; ISS; 105-H; Reactor; | |
DOI : 10.2172/972701 RP-ID : WCH-033 PID : OSTI ID: 972701 Others : TRN: US1001791 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705180000449LZ | 13250KB | download |