科技报告详细信息
NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation
Nikkel, D J
关键词: CAPACITY;    COMPUTERIZED SIMULATION;    COMPUTERS;    DESIGN;    PUBLIC LAW;    SECURITY;    SIMULATION;    STOCKPILES;    TESTING;    VALIDATION;    WEAPONS;   
DOI  :  10.2172/964512
RP-ID  :  LLNL-TR-415208
PID  :  OSTI ID: 964512
Others  :  TRN: US200919%%539
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3) Identify the technical challenges facing the program and a strategy to resolve them.

【 预 览 】
附件列表
Files Size Format View
RO201705170001507LZ 270KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:11次