Lessons Learned in Risk Management on NCSX
Neilson, G. H. ; Gruber, C. O. ; Harris, J. H. ; Rej, D. J. ; Simmons, R. T. ; Strykowsky, R. L.
关键词: CANCELLATION;    CONSTRUCTION;    DESIGN;    MANAGEMENT;    ORNL;    PERFORMANCE;    PHYSICS;    PLASMA;    SCHEDULES;    STELLARATORS Program Management;    Project Summaries;    NCSX;    Stellerators;    Engineering;    Risk Management;   
DOI  :  10.2172/960218
RP-ID  :  PPPL-4427
PID  :  OSTI ID: 960218
Others  :  TRN: US0903064
学科分类:原子、分子光学和等离子物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

【 预 览 】
附件列表
Files Size Format View
RO201705170001501LZ 20214KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:47次