科技报告详细信息
Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008
Weiland, Mark A. ; Kim, Jina ; Nagy, William T. ; Johnson, Gary E.
关键词: BONNEVILLE POWER ADMINISTRATION;    DAMS;    FISH PASSAGE FACILITIES;    TROUT;    EVALUATION;    SEASONAL VARIATIONS;   
DOI  :  10.2172/1001548
RP-ID  :  PNNL-18323
PID  :  OSTI ID: 1001548
Others  :  Other: 400403209
Others  :  TRN: US201105%%942
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.
【 预 览 】
附件列表
Files Size Format View
RO201705170001195LZ 3288KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:32次