科技报告详细信息
L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report
Durham, Robin E. ; Sackschewsky, Michael R.
关键词: HABITAT;    MITIGATION;    MONITORING;    SEEDLINGS;    HANFORD RESERVATION;    REMEDIAL ACTION;    POWER SYSTEMS;    MODIFICATIONS;    ENVIRONMENTAL IMPACTS;    REVEGETATION Habitat Mitigation;    L-325;    Sagebrush;   
DOI  :  10.2172/968478
RP-ID  :  PNNL-18824
PID  :  OSTI ID: 968478
Others  :  Other: 830403000
Others  :  TRN: US0904732
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimum number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.

【 预 览 】
附件列表
Files Size Format View
RO201705170000863LZ 231KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:40次