科技报告详细信息
Scale-Up, Production, and Procurement of PEP Simulants
Scheele, Randall D. ; Brown, Garrett N. ; Kurath, Dean E.
关键词: AR FACILITIES;    PROCESS DEVELOPMENT UNITS;    RADIOACTIVE WASTE PROCESSING;    HANFORD RESERVATION;    RADIOACTIVE MATERIALS;    SIMULATION;    LEACHING;    PROCUREMENT;    ULTRAFILTRATION;    WASHING;    PERFORMANCE TESTING PEP;    simulants;   
DOI  :  10.2172/968207
RP-ID  :  PNNL-18678
PID  :  OSTI ID: 968207
Others  :  Other: 830403000
Others  :  TRN: US0904576
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility. The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. This report provides the lessons learned regarding the manufacture and delivery of simulated feeds for PEP testing.

【 预 览 】
附件列表
Files Size Format View
RO201705170000530LZ 2367KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:19次