科技报告详细信息
Resource Form Factor and Installation of GFA Controllers
DeSteese, John G. ; Hammerstrom, Donald J.
关键词: ELECTRIC APPLIANCES;    WATER HEATERS;    CONTROL EQUIPMENT;    DESIGN;    POSITIONING;    FORM FACTORS;    RELIABILITY;    LOAD MANAGEMENT;    COST;    SERVICE LIFE;   
DOI  :  10.2172/974985
RP-ID  :  PNNL-18966
PID  :  OSTI ID: 974985
Others  :  Other: 600306000
Others  :  TRN: US201008%%430
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly™ appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controller’s relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

【 预 览 】
附件列表
Files Size Format View
RO201705170000384LZ 292KB PDF download
  文献评价指标  