科技报告详细信息
REAL WASTE TESTING OF SLUDGE BATCH 5 MELTER FEED RHEOLOGY | |
Reboul, S. ; Stone, M. | |
关键词: DATA; EVAPORATORS; MATERIALS; NATIONAL DEFENSE; PROCESSING; RHEOLOGY; SLUDGES; TESTING; WASTE PROCESSING; WASTES; YIELDS; | |
DOI : 10.2172/980761 RP-ID : SRNL-STI-2010-00113 PID : OSTI ID: 980761 Others : TRN: US201012%%1207 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
Clogging of the melter feed loop at the Defense Waste Processing Facility (DWPF) has reduced the throughput of Sludge Batch 5 (SB5) processing. After completing a data review, DWPF attributed the clogging to the rheological properties of the Slurry Mix Evaporator (SME) project. The yield stress of the SB5 melter feed material was expected to be high, based on the relatively high pH of the SME product and the rheological results of a previous Chemical Process Cell (CPC) demonstration performed at the Savannah River National Laboratory (SRNL).【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704240002742LZ | 404KB | download |