Evaluation of Sludge Batch 5 Qualification with ISDP Salt Batch 1 Compliance to DWPF Waste Acceptance Criteria | |
Shafer, A. | |
关键词: AR FACILITIES; EVALUATION; SLUDGES; RADIOACTIVE WASTE PROCESSING; CERTIFICATION; WASTE FORMS; SLURRIES; | |
DOI : 10.2172/978450 RP-ID : SRR-DWP-2010-00013 PID : OSTI ID: 978450 Others : TRN: US1003095 |
|
学科分类:核能源与工程 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
The purpose of this report is to document the acceptability of Sludge Batch 5 with the initial macrobatch operation of the Interim Salt Disposition Project (ISDP) waste to the Defense Waste Processing Facility (DWPF). This report was prepared to comply with the requirements listed in the Waste Acceptance Criteria for Sludge, Actinide Removal Process (ARP), and Modular Caustic Side Solvent Extraction Unit (MCU) Process Transfers to 512-S and DWPF. The requirements for transfers to 512-S were evaluated during ISDP Salt Batch 1 qualification. The calculations of sludge concentrations are based entirely on the Tank 51 sample processed at SRNL. This is conservative because Tank 51 is blended with the dilute feed in the DWPF Feed Tank (Tank 40). This report documents the acceptability of sludge only as well as Sludge Batch 5 sludge slurry combined with ARP/MCU products for feed to DWPF. All criteria were met for unblended Tank 51 material.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704240002305LZ | 1097KB | download |