The Lake Charles CCS Project
Doug Cathro
关键词: CARBON;    CARBON DIOXIDE;    COKE;    COMMERCIALIZATION;    COMPRESSION;    CONNECTORS;    CONSTRUCTION;    DESIGN;    ENERGY SUPPLIES;    GASIFICATION;    MONITORING;    OIL FIELDS;    PETROLEUM PRODUCTS;    PIPELINES;    SECURITY;    SPECIFICATIONS;    STORA;   
DOI  :  10.2172/1010957
RP-ID  :  None
PID  :  OSTI ID: 1010957
Others  :  TRN: US201109%%375
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.
【 预 览 】
附件列表
Files Size Format View
RO201704240001858LZ 25497KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:27次