科技报告详细信息
T-TY Tank Farm Interim Surface Barrier Demonstration???Vadose Zone Monitoring Plan
Zhang, Z. F. ; Strickland, Christopher E. ; Field, Jim G. ; Parker, Danny L.
关键词: AR FACILITIES;    CALIBRATION;    CAPACITANCE;    FARMS;    FENCES;    HYDRAULICS;    MONITORING;    NEUTRON PROBES;    PIPELINES;    PLUMES;    RADIOACTIVE WASTES;    RIVERS;    SOILS;    STORAGE FACILITIES;    TANKS;    WAST;   
DOI  :  10.2172/1000175
RP-ID  :  PNNL-19772
PID  :  OSTI ID: 1000175
Others  :  Other: 830403000
Others  :  TRN: US1101729
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy???s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

【 预 览 】
附件列表
Files Size Format View
RO201704240000972LZ 4449KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:25次