科技报告详细信息
Compare 100 GeV/n Au Run 2010 with Run 2007
Zhang, S.Y.
关键词: COMMISSIONING;    LIFETIME;    LUMINOSITY;    SCATTERING;    STOCHASTIC COOLING relativistic heavy ion collider;   
DOI  :  10.2172/1007885
RP-ID  :  BNL--94622-2011-IR
PID  :  OSTI ID: 1007885
Others  :  R&D Project: KBCH139
Others  :  18031
Others  :  Other: KB0202011
Others  :  TRN: US1101795
学科分类:核物理和高能物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

With the very successful commissioning of the vertical stochastic cooling in 100 GeV/n Au Run 2010, the IBS (intra-beam scattering) is no longer the dominant factor in terms of the integrated luminosity. A new luminosity model is needed, where the beam intensity lifetime is more important and the burn-off needs to be accounted for. Toward this goal, a brief review of the Run 2010, compared with Run 2007, is presented.

【 预 览 】
附件列表
Files Size Format View
RO201704210003427LZ 265KB PDF download
  文献评价指标  
  下载次数:1次 浏览次数:14次