科技报告详细信息
Summary of the Special Analysis of Savannah River Depleted Uranium Trioxide Demonstrating the Before and After Impacts on the DOE Order 435.1 Performance Objective and the Peak Dose
Shott, G.J.
关键词: COMPLIANCE;    DEPLETED URANIUM;    ENVIRONMENTAL PROTECTION;    PERFORMANCE;    SAVANNAH RIVER PLANT;    WASTES depleted uranium trioxide;    Savannah River;    SRS;    Area 5 RWMS;    NNSS;   
DOI  :  10.2172/1008343
RP-ID  :  DOE/NV/25946--1129
PID  :  OSTI ID: 1008343
Others  :  TRN: US1104836
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
This report summarizes the special analysis (SA) of the Savannah River Depleted Uranium Trioxide waste stream (SVRSURANIUM03, Revision 1) demonstrating the before and after impacts of the waste stream to the DOE Order 435.1 performance objective at the disposal facility, and the peak dose. The Nevada Division of Environmental Protection (NDEP) requested this SA and asked the Nevada Site Office (NSO) to run the SA deterministically and assume that all the model conditions remain the same regardless of the length of time to the peak dose. Although the NDEP accepts that DOE Order 435.1 requires a compliance period of 1,000 years, it also requested to know what year, if any, the specific DOE performance objectives will be exceeded. Given the NDEP???s requested model conditions, the SA demonstrates the Rn-222 peak dose will occur in about 2 million years and will exceed the performance objective in about 6,000 years. The 0.25 mSv y-1 all-pathway performance objective was not exceeded for the resident scenario after reaching the 4 million year peak dose.
【 预 览 】
附件列表
Files Size Format View
RO201704210003337LZ 39KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:23次