科技报告详细信息
Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010
Carlson, Thomas J. ; Johnson, Gary E. ; Woodley, Christa M. ; Skalski, J. R. ; Seaburg, Adam
关键词: BASALT;    COLUMBIA RIVER;    COMPLIANCE;    DREDGING;    EXPLOSIVE FRACTURING;    MONITORING;    NAVIGATION;    PACIFIC OCEAN;    REMOVAL;    RIVERS;    US CORPS OF ENGINEERS;   
DOI  :  10.2172/1023122
RP-ID  :  PNNL-20388
PID  :  OSTI ID: 1023122
Others  :  Other: 400403209
Others  :  TRN: US201118%%873
学科分类:地球科学(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.
【 预 览 】
附件列表
Files Size Format View
RO201704210002311LZ 4635KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:17次