科技报告详细信息
OECD MCCI 2-D Core Concrete Interaction (CCI) tests : CCI-2 test data report-thermalhydraulic results, Rev. 0 October 15, 2004.
Farmer, M. T. ; Lomperski, S. ; Kilsdonk, D. J. ; Aeschlimann, R. W. ; Basu, S. (Nuclear Engineering Division) ; (NRC)
关键词: ACCIDENT MANAGEMENT;    CONCRETES;    CONTAINMENT;    CORIUM;    GASES;    HEAT TRANSFER;    MANAGEMENT;    OECD;    QUENCHING;    REACTOR MATERIALS;    RECOMMENDATIONS;    SAND;    SHAPE;    SPECIFICATIONS;    THERMAL HYDRAULICS;    TRANSIENTS;    WATER;   
DOI  :  10.2172/1014854
RP-ID  :  OECD/MCCI-2004-TR05
PID  :  OSTI ID: 1014854
Others  :  TRN: US1102883
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The Melt Attack and Coolability Experiments (MACE) program addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two program objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of satisfying these objectives, the Management Board (MB) approved the conduct of two long-term 2-D Core-Concrete Interaction (CCI) experiments designed to provide information in several areas, including: (i) lateral vs. axial power split during dry core-concrete interaction, (ii) integral debris coolability data following late phase flooding, and (iii) data regarding the nature and extent of the cooling transient following breach of the crust formed at the melt-water interface. This data report provides thermal hydraulic test results from the CCI-2 experiment, which was conducted on August 24, 2004. Test specifications for CCI-2 are provided in Table 1-1. This experiment investigated the interaction of a fully oxidized 400 kg PWR core melt, initially containing 8 wt % Limestone/Common Sand (LCS) concrete, with a specially designed two-dimensional LCS concrete test section with an initial cross-sectional area of 50 cm x 50 cm. The report begins by providing a summary description of the CCI-2 test apparatus and operating procedures, followed by presentation of the thermal-hydraulic results. Detailed posttest debris examination results will be provided in a subsequent publication. Observations drawn within this report regarding the overall cavity erosion behavior may be subject to revision once the posttest examinations are completed, since these examinations will fully reveal the final cavity shape.
【 预 览 】
附件列表
Files Size Format View
RO201704210002244LZ 7591KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:16次